The house renovation cost can vary enormously. Updating a sound property with a new kitchen, bathroom and finishes is one thing. Renovating a house that also needs structural alterations, roof repairs, rewiring or major building work is another.

That makes it difficult to give one useful average for an entire property. A better way to plan your budget is to identify what the house actually needs, price the major elements and leave room for problems that may only become apparent once work starts.

The costs in this guide are indicative only and should not be treated as quotations. Actual prices vary by property, location, specification and scope. Obtain property-specific quotations and relevant professional advice before committing to major work.

How Much Does a House Renovation Cost?

For an early budget, it is usually more useful to look at individual projects than rely on one headline figure for a “full renovation”.

The Federation of Master Builders’ June 2026 renovation guidance gives the following broad starting points:

Renovation work Indicative guide cost
New bathroom Around £5,000
New kitchen From £10,000
Garage conversion Around £13,000
Velux loft conversion From £30,000
New roof From £13,000

These are industry guide prices rather than Ridley Roofing & Building quotations. Actual costs depend on the property, specification, access, location and what is uncovered once work begins.

A relatively sound home may only need decoration, flooring and selected upgrades. An older property requiring structural repairs, roofing, new services and internal reconfiguration can need a much larger budget.

What Affects House Renovation Cost?

Two houses of the same size can have very different renovation costs. The biggest differences usually come down to condition, structural work, roofing, specification and the number of trades involved.

The Condition of the Property

A house that looks dated is not necessarily a difficult renovation. If the roof, structure, electrics and plumbing are sound, much of the work may be cosmetic.

More expensive problems are often less obvious:

    • structural movement or cracking

    • damp and water ingress

    • damaged roof timbers

    • failing roof coverings

    • outdated electrics or plumbing

    • defective drainage

    • rotten timber

    • poor-quality previous alterations

If you are buying a property to renovate, understanding its condition before setting the final budget is important. The RICS guide to home surveys explains the different survey levels, including Level 3 surveys for older, unusual or run-down properties and homes where major work is planned.

Finding issues early gives you a better chance of budgeting for them before money is committed to finishes.

Structural Alterations

House renovation with exposed ceiling joists and structural building work.

Changing the layout can improve how a home works, but structural changes require more planning than simply taking a wall down.

Removing a load-bearing wall, installing steelwork, dealing with foundations or correcting structural movement may require engineering calculations and building control involvement. There may also be associated costs for moving services and making good floors, walls and ceilings afterwards.

If your project involves load-bearing walls, steel beams, underpinning or other significant changes, our structural renovations service covers this type of building work alongside structural engineer and building control requirements where applicable.

Getting that input early can help you understand the likely scope and sequence before work begins.

The Roof

The roof is one area we would recommend checking early. There is little sense installing fresh plaster, flooring and decoration beneath a roof that is still allowing water into the property.

Costs depend on whether you need a localised repair or more extensive replacement work, as well as roof size, pitch, materials, scaffolding, access and the condition of the structure underneath.

If there are leaks, slipped tiles or storm damage, addressing necessary roof repairs before internal finishes can reduce the risk of further damage during the renovation.

For properties in Wales, check the Welsh Government guidance on Building Regulations for roofing work before starting. Whether approval is needed depends on the nature and extent of the work.

Older Properties Can Bring Several Jobs Together

Renovating an older home does not always involve one isolated problem.

In a customer testimonial published on our site, work to a 500-year-old Welsh farmhouse included a new Welsh slate roof and roof structure, chimney cladding, spray rendering and renovation of an attic office.

It is a useful example of how roofing, structural work, external repairs and internal improvements can overlap, particularly in older properties that have been altered or repaired over many years.

Kitchens, Bathrooms and Finishes

Kitchens and bathrooms can absorb a large part of a renovation budget because several trades are often involved.

A kitchen may require removal, plumbing, electrical work, plastering, flooring, cabinetry, worktops, appliances and decorating. Bathrooms can combine plumbing, electrics, ventilation, tiling and fitted products within a small space.

Specification matters too. Moving plumbing or changing the layout usually costs more than replacing fittings in the same positions. Across the rest of the house, flooring, doors, windows, lighting, sanitaryware, tiles and appliances can add up quickly.

Agreeing your general specification before quotations are prepared makes it easier to compare prices and control upgrades once work begins.

What Other Renovation Costs Should You Allow For?

Building work is rarely the only expense. Depending on the project, your budget may also need to include:

    • surveys and structural engineer fees

    • architectural drawings

    • planning or building control charges

    • scaffolding

    • skips and waste disposal

    • storage or temporary accommodation

    • decorating and final finishes

    • VAT

    • unforeseen work

Some defects only become visible once floors, ceilings or old finishes are opened up. Build a separate contingency into the budget for these surprises. No percentage suits every renovation, so the amount should reflect the property’s age, condition and how much can be inspected beforehand.

Remember to Account for VAT

VAT can make a meaningful difference to a substantial renovation budget.

Under the current GOV.UK guidance on VAT for building work, most work to existing houses and flats carried out by VAT-registered builders and similar trades is normally subject to the standard 20% rate.

Reduced rates can apply in certain circumstances, including some qualifying renovation work to residential properties that have been empty for a specified period.

Do not assume a reduced rate applies. Check the current HMRC requirements and confirm whether VAT is included in each quotation before comparing prices.

How to Build a Realistic Renovation Budget

Budget for essential building work first, then decide what remains for upgrades and finishes.

Couple reviewing building plans during a home renovation.

Step 1: Separate Essential Work From Improvements

Start with the jobs needed to make the building structurally sound, weatherproof, and functional:

    1. structural repairs

    1. roof work

    1. damp or drainage problems

    1. electrical work

    1. plumbing and heating

    1. windows and external openings

Then list improvements such as a new kitchen, bathroom, flooring, or layout.

Step 2: Create a Detailed Scope

Avoid asking a builder simply to “price a renovation”.

Set out what needs to happen in each area. For a kitchen, for example, specify whether the quote should include removal, waste disposal, electrics, plumbing, plastering, units, worktops, flooring and decorating.

The clearer the scope, the easier it is to compare quotations fairly.

Step 3: Compare What Is Actually Included

Do not compare quotes using only the figure at the bottom of the page. Check:

    • labour and materials

    • scaffolding and waste removal

    • VAT

    • making good and finishing work

    • timescale

    • exclusions

    • how additional work will be agreed

For larger renovations involving several trades, experienced building contractors can provide one point of contact for coordinating different stages of the work.

Step 4: Put the Work in the Right Order

Although every renovation is different, work may broadly progress through:

    1. structural work

    1. roofing and weatherproofing

    1. damp and drainage work

    1. first-fix electrics and plumbing

    1. heating

    1. walls and ceilings

    1. kitchens and bathrooms

    1. flooring, joinery and decoration

The exact order depends on the property and scope, so agree the programme with the relevant contractors before work starts.

Is £50,000 Enough to Renovate a House?

There is no reliable yes-or-no answer without knowing the property and scope.

For some fundamentally sound homes, £50,000 may cover substantial improvements. In another property, essential structural, roofing, electrical, or plumbing work could absorb much of that budget before kitchens, bathrooms, and finishes are considered.

List the necessary work and obtain property-specific quotations before deciding what £50,000 can realistically cover.

Is £100,000 Enough for a Full Renovation?

Again, it depends on the scope.

£100,000 may provide significant room for work on some homes, while a larger property, substantial structural reconfiguration, an extension, extensive roofing or a high specification could require considerably more.

“Full renovation” is not a fixed package. Define what needs doing first, then use detailed quotations to judge whether the available budget is realistic.

Should You Use a Cost Per Square Metre?

Square-metre rates can be useful for some types of construction, but they are less reliable for an existing-house renovation.

Two homes with the same floor area may require completely different work. One might need plastering, flooring and a kitchen. The other could need roof repairs, rewiring, structural steel and damp treatment before decorating starts.

For renovation work, the property’s condition and detailed scope generally tell you more than floor area alone.

Where Should You Spend Your Renovation Budget First?

We would prioritise the structure, roof and essential services before spending heavily on finishes.

Get the building sound, address water ingress and deal with essential systems before committing most of the budget to cosmetic work.

A more expensive worktop or flooring choice can be considered later. Structural problems or a leaking roof are much harder to deal with once the new kitchen and decoration are already in place.

Planning Your House Renovation

There is no single house renovation cost that will accurately apply to every home.

The most useful budget comes from understanding the property’s condition, defining the scope, obtaining detailed quotations, and keeping money aside for unforeseen work.

If your renovation includes structural, roofing, or wider building work, agreeing on that scope early makes it easier to plan the sequence of the project and obtain a clearer quotation. That gives you a more reliable starting point than trying to make your property fit somebody else’s renovation average.